Stainless Steel Bypass Pruning Shears with Blade Lock, Four Colours

Garden tools

Stainless Steel Bypass Pruning Shears with Blade Lock, Four Colours

from €2.44 per piece, net, at the factory MOQ

Entry-price bypass pruning shears with a stainless steel blade, two-component non-slip handles, a coil spring and a blade lock. Blade length is 2 in, the tool is designed for right-handed use when trimming branches, shrubs and flowers.

Offered in green, yellow, red and grey – a colourful, budget-friendly volume item for garden centres, DIY stores and seasonal promotions.

  • MOQ 50 pcsminimum order (factory MOQ)
  • Branding on requestlogo, colours, packaging
  • GPSR label & EU docswe act as EU importer
  • 8–12 weeks to your doorrail/sea; air on request

Indicative “from” price per piece, excl. VAT, freight and duty. Your delivered price depends on quantity, branding and destination — written offer within 2 working days.

Specifications

TypeBypass pruner, right-handed
BladeStainless steel
Blade length2 in (5.08 cm)
HandlesTwo-component, non-slip
FeaturesBlade lock, coil spring
ColoursGreen, yellow, red, grey

Data from the manufacturer. Sizes, colours and materials can be adjusted for orders above the MOQ.

How to order this product

Ask for a price

Tell us the quantity, colours and destination country. Offer within 2 working days.

Get a sample

We send a sample to your address in 7–14 days. The cost is credited against the order.

Production and QC

The factory produces in 25–45 days; we inspect the goods before they leave the factory.

Delivery

Rail or sea to Poland in 25–45 days, customs cleared, then to your warehouse.

Frequently asked questions

What is the minimum order for the Stainless Steel Bypass Pruning Shears with Blade Lock, Four Colours?

The factory minimum is 50 pcs. For orders with your own logo or packaging the minimum is usually higher — we confirm it in the offer.

Can I get it with my own logo?

Most products can carry a logo on the product, the label or the packaging. We check the options with the factory and show you a mock-up before production.

Is it compliant for sale in the EU?

We import as an EU company, prepare GPSR labelling with the responsible person and product safety information, and order tests where the material requires it.

How long does delivery take?

Usually 8–12 weeks from order to your warehouse by rail or sea: 25–45 days production plus 25–45 days transport. Air freight takes 7–12 days after production.

Request a price for this product

Quantity, colours and delivery country are enough for a first offer. Add your logo if you want it branded.

  • Reply on working days, usually within a few hours
  • Prices delivered to your door, customs and VAT included in the calculation
  • Written offer within 2 working days
Prefer email? corp@gardeniq.eu WhatsApp
Attach files Product list, photos, logo — XLSX, CSV, PDF, PNG, JPG, ZIP, up to 10 MB each