SDS-plus Rotary Hammer 800 W, 3 J, 26 mm Drilling, 220–240 V

Grinders, hammers & saws

SDS-plus Rotary Hammer 800 W, 3 J, 26 mm Drilling, 220–240 V

from €100.63 per piece, net, at the factory MOQ

FRH80001-2 corded rotary hammer for installation and renovation: holes for plugs and anchors, chasing, light removal of tiles and plaster. According to the supplier: 220–240 V, 50/60 Hz, 800 W, 3 J impact energy, 0–1100 rpm, 0–4000 bpm, max. drilling diameter 26 mm, SDS-plus chuck. OEM orders accepted.

  • MOQ 3 pcsminimum order (factory MOQ)
  • Your logo possiblelogo, colours, packaging
  • GPSR label & EU docswe act as EU importer
  • 8–12 weeks to your doorrail/sea; air on request

Indicative “from” price per piece, excl. VAT, freight and duty. Your delivered price depends on quantity, branding and destination — written offer within 2 working days.

Specifications

Typerotary hammer
Voltagecorded, 220–240 V (per supplier)
Power800 W (per supplier)
Impact energy3 J (per supplier)
No-load speed0–1100 rpm
Impact rate0–4000 bpm
Max. drilling diameter26 mm
Tool holderSDS-plus
PlugEU plug type agreed on order
Documentsbatch documents — on request

Data from the manufacturer. Sizes, colours and materials can be adjusted for orders above the MOQ.

How to order this product

Ask for a price

Tell us the quantity, colours and destination country. Offer within 2 working days.

Get a sample

We send a sample to your address in 7–14 days. The cost is credited against the order.

Production and QC

The factory produces in 25–45 days; we inspect the goods before they leave the factory.

Delivery

Rail or sea to Poland in 25–45 days, customs cleared, then to your warehouse.

Frequently asked questions

What is the minimum order for the SDS-plus Rotary Hammer 800 W, 3 J, 26 mm Drilling, 220–240 V?

The factory minimum is 3 pcs. For orders with your own logo or packaging the minimum is usually higher — we confirm it in the offer.

Can I get it with my own logo?

Most products can carry a logo on the product, the label or the packaging. We check the options with the factory and show you a mock-up before production.

Is it compliant for sale in the EU?

We import as an EU company, prepare GPSR labelling with the responsible person and product safety information, and order tests where the material requires it.

How long does delivery take?

Usually 8–12 weeks from order to your warehouse by rail or sea: 25–45 days production plus 25–45 days transport. Air freight takes 7–12 days after production.

Request a price for this product

Quantity, colours and delivery country are enough for a first offer. Add your logo if you want it branded.

  • Reply on working days, usually within a few hours
  • Prices delivered to your door, customs and VAT included in the calculation
  • Written offer within 2 working days
Prefer email? corp@gardeniq.eu WhatsApp
Attach files Product list, photos, logo — XLSX, CSV, PDF, PNG, JPG, ZIP, up to 10 MB each